Your entries stay in this page. Nothing is sent or saved on a server. Reloading clears them; printing creates your own copy. A smaller price does not mean an equivalent specification.
Measure a rectangular floor
Enter measured internal dimensions. This is floor area only: it does not specify coating consumption, wastage or a suitable system. For irregular rooms, measure and add separate rectangles; ask the installer to verify the final area.
1. Use comparable totals
Use written totals in ZAR, with the same tax basis and scope. Do not compare a materials-only price with a prepared and installed job.
2. Check what the price covers
Leave unclear items as “Not stated / unknown”. Ask the contractor to put the scope and exclusions in writing. Mark items not relevant to your project as “Not applicable”.
| Item to clarify | Quote A | Quote B |
|---|---|---|
| Inspection and moisture testing | ||
| Grinding / preparation of the substrate | ||
| Crack repairs and joint treatment | ||
| Primer, layers and specified thickness | ||
| Slip resistance and intended traffic | ||
| UV exposure / topcoat where needed | ||
| Tax, waste and preparation extras | ||
| Return-to-service conditions and exclusions |
3. Confirm before agreeing
Ask the contractor to explain each difference, confirm insurance appropriate to the work, and give you the final scope, total, payment schedule and exclusions in writing. This checklist is a planning aid, not a technical inspection or approval of a provider.